KitLog pro

Powered By Kitlog Pro v2.0

ONEX #54 Web Site
' style=
Date:  11-26-2013
Number of Hours:  2.00
Manual Reference:  P10
Brief Description:  Wires through baffles

Drilled holes in the aft baffle assembly for upper plug wires, oil pressure sensor wires and CHT wires. Installed grommets and fitted the wires.

Cut the intake pipe to intake manifold hose to 2.5" length. This keeps the entire connector hose within the baffle area. Before connecting the intake pipe, I slipped a 2-220 o-ring over the tube to help fill some of the gap through the baffle. Hopefully pressure within the forward cowling will press the o-ring against the baffle, creating something of a seal around the pipe.
' style=

Baffle wire penetrations

Baffle wire penetrations

' style=

2-220 o-ring around intake tube

2-220 o-ring around intake tube

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.